Hyppää sisältöön

Introduction to the upgrade of CyberElements Bastion

The product upgrade consists of updating the various servers and clients/agents with the latest versions of the components.

Upgrading to CyberElements Bastion 4.7 also implies upgrading the OS base: switching from Debian 12 (Bookworm) to Debian 13 (Trixie). The PostgreSQL database instance of the Mediation Controller moves from version 15 to version 17 at the same time.

The upgrade to version 4.7 is performed from a platform in version 4.6. A platform in an earlier version must first be upgraded to version 4.6.

Recommendation

The security hardening guide details the follow-up of the Debian version and of its security maintenance: see R2 and R7.

  • Live update


    Update the servers and components currently deployed. This method requires planning for a production shutdown during the upgrade.